Jialing river, A tributary of the Yangtze River is the important sea route of Sichuan province. The Jialing River's most notable characteristic is its rapid flood and drop. One cargo vessel in Jialing river loaded with 1500 tonnes beans run aground near Jiangbei wharf after a rapid drop down of water level. Half of vessel rested on a bank slope , its bow was 3 meters higher from the ground. The distance of aground vessel to the nearby bridge pier is less than 100 meters.
Considering the possible collision of vessel with bridge pier by fluctuant water, people must salvage the vessel as soon as possible. Eversafe engineers were called to the site urgently. After checking vessel bottom, Eversafe engineers presented the salvage plan: using fours pieces marine bags to lift vessel up from bank , then vessel can move into water with rolling airbags by its gravity force. This plan was the most convenient and economical method to relaunch the vessel at that time. After a 30 minutes discussion of ship owner with our engineers, Eversafe Marine got awarded the contract. During the period of waiting for airbags arrival, people began to discharge cargos on vessel. Fours pieces marine airbags was trucked to the site in the next day. The first air bag was inserted to lift up bow slightly, then left bags were installed one by one. When vessel bottom was fully lifted up from slope, Eversafe engineer slowly lifted up vessel’s bow to start vessel movement. About 30 minutes, the vessel entered into water totally. It is a simple but ingenious salvage operation that indicates airbags salvage advantages. Marine airbags are easy to transport and can lift up thousands tonnes vessel only need a solid support ground. Marine airbags can refloat vessels underwater with their buoyancy. So marine airbags enable companies to do salvage jobs with small investment. Souce from: Eversafe Marine
Sunday, July 22, 2012
Wednesday, June 27, 2012
Docking Conversion ship with marine airbags
Eversafe Marine contracted a 3600 tonnes conversion ship docking project recently. That ship with 8.2 m molded depth is 122 m long and 32 m wide. The hauling out project was carried out with 22 pieces marine airbags and two 20 tonnes winches on Yangtse river side.
Docking ship with air bags is a good choice for remote area where lack of docking slipway or temporary docking. Compressed natural ground can meet the docking demand of small size vessel. To enhance ground bearing capacity for big vessel docking with marine airbags, steel plates are found to be convenient and useful.
Docking ship with air bags is a good choice for remote area where lack of docking slipway or temporary docking. Compressed natural ground can meet the docking demand of small size vessel. To enhance ground bearing capacity for big vessel docking with marine airbags, steel plates are found to be convenient and useful.
Sunday, April 15, 2012
Eversafe cargo ship airbag launching projects
On 7th March 2012,the DWT 20800 cargo ship "Dong Hong Hang 3" was launched with Eversafe airbags in Zhejiang Donghong shipyard.
Two days later,another DWT52000 cargo ship was successfully launched by Eversafe airbag launching team. The cargo ship named "Yong Xing NO.5" with unattended machinery space is classified by CCS (China Classification Society). It measures by 195 m total length ,32.3 m moulded breadth and 17.3 m depth.
Those airbag launching projects go smoothly since the concrete slipway and water level are both satisfying. By calculation Eversafe Marine optimized the air bags space and pressures to control the launch speed and ensure the launch safety when vessel bow refloats.It took two days to jack up vessels with airbags and remove support blocks, only 90 seconds to launch the vessel into water.
On 8th April, in the same shipyard the third DWT 13000 cargo ship was launched by Eversafe Marine.The ship named" Dong hong 37" with 120 m total length,22 m moulded breadth and 11m depth. It is classified by BV.
Eversafe Marine is the total contractor for above launching projects, providing design, marine air bags and launching team. Eversafe Marine is devoted to airbag engineering, from vessel launching to heavy lifting and transport.Safety and high efficiency is company's goal.Eversafe Marine now has the ability to perform three global projects at the same time.
News from : Eversafe Marine
Labels:
cargo ship,
eversafe marine,
marine airbags,
ship launching
Comparison of marine airbag and SPMT for heavy load out
Marine airbags are often called ship launching airbags that indicates they are most used for launching ship into water. Inspired by ship launching, people developed many applications of marine airbags in different fields, the most remarkable one is heavy lifting and moving with marine airbags.
SPMT stands for self-propelled modular transporter, a platform vehicle with a large array of wheels; it is equipped with Power Pack Unit which provides the propulsion.
Obviously marine airbags are not as famous as SPMTs in heavy lifting and transport fields. The main reason is that marine airbag is not a high developed industry product yet; its ISO standard was issued only at 2011 years. Due to special manufacture technology marine airbags can only be made in China which also limited its worldwide development.
Marine airbags heavy lifting and load out has similarity with SPMTs but more difference. A comparison may help people to know their individual characters.
Heavy Lifting
Lifting Capacity
The SPMTs consist of four-axle units or six-axle units, the maximum allowable axleline payload is 30 tons per line. Then we can know:
Marine airbag’s lifting performance is decided by its working height and inner pressure.
Airbag specification Load Lifting height Airbag pressure
1.0 ×15 m 471 tons 0.5 m 4 bar
1.5 ×15 m 235 tons 1.0 m 2 bar
2.0 ×15 m 420 tons 1.0 m 1.8 bar
Provided there is a caisson with follow dimension needs to be lifted.
Length(m) Width(m) Height(m) Weight(t)
20.45 13.45 17.3 2357
To lift this caisson at 0.5 m high from ground people may choose 6 pieces airbags (1.0×15 m). The total 6 pieces airbags’ lifting capacity is 422×6=2533 tons. Air bags can be positioned with 4 m space.
To lift this caisson with SPMTs, people will need 2357/180=13 units 6 line modules but the structure dimension decides maximum 12 units modules can be deployed. Then SPMTs is not suit for this caisson lifting and moving.
Article from : Marine airbags VS. SPMTs
Labels:
heavy lifting,
heavy load out,
marine air bags,
SPMTs
Thursday, December 15, 2011
Eversafe project of concrete structure shift with air bags
Tieshan Port Industrial Park is located in Guangxi Zhuang Autonomous Region, China. The Park is one of the three important industrial zones for the Beibu Gulf Development, which was approved by China’s Central Government.
The construction project consisted of two phases: the NO.1-2 berth construction have already been finished and NO.3-4 berths construction work started from August 2010.
In plan total 40 Caissons will be installed for NO.3-4 berths construction. Eversafe Marine was engaged by the Administration for the Beibu Gulf to carry out caisson transportation works, from fabrication site to submersible barge with heavy lifting marine airbags. Caisson transportation with marine air bags is a new technology which doesn’t need rails and trolleys and can transport concrete structure on compacted ground. So it enables fabricating caissons on temporary site which can be located near shipping position. Using balloons to transport caissons to submersible barge then launch it can save more than 40 percent investment comparing with trolley transportation method,not mention the time saving.
The first caisson measures 24 meters by length, 16.4 meters by width and 20.75 meters by height. Its weight reaches 3050 tons. To move caissons from construction site to shipping out position , Eversafe team made the masterly plan which consists of three steps: lifting first ,length ways move then transverse move. Total four winches were employed to control caisson movement: two winches from submersible barge to pull caisson move forward and other two winches were used to stop caisson.
Total 8 pieces heavy lifting air bags with 1 m diameter and 16 meters length were used to lift the caisson. Each air bag carry about 380 tons with 0.25 Mpa pressure. To roll caisson out 24 pieces 8 meters long air bags were arranged in two rows and kept in 40 cm height to ensure caisson movement stability. It took us about 3 hours to transport the first caisson to ship out position.
When using air bags to move caissons aboard submersible barge, the barge need not to sit on seabed. Often people use steel plates to connect bank and barge deck to roll caisson on to board. Submersible barge can rise or sink by adjusting ballast water to adopt coming caisson. And in flood tide the barge operation will be easier.
Sunday, December 11, 2011
Wuzhou Heavy industry launched DWT36000 cargo ship
On 24th November Wuzhou Heavy industry launched a DWT36000 cargo ship with Eversafe airbag launching service. This cargo ship measures 190 meters by total length and 28.3 meters by moulded breadth. It is named “ Meishan gang 57” by owner Zhejiang Hongchen Shipping Company which is a private owned transportation company.
Lianyungang Wuzhou Shipbuilding Heavy Industry Co., Ltd. was founded in May 2007, is located in Jiangsu Guanyun County town of Lianyungang which is adjacent to the Guanhe River estuary. Currently the company covers an area of 880,000 square meters, has 1.1 kilometers of coastline. Has built five berths below 20,000 tons, eight berths between 30,000-50,000 tons, one berth of 80,000 tons. The shipyard equipped with 32 gantry cranes which include 200 tons and 100 tons.
This river is in low water period so launching water is 2 meters lower than normal level. To conquer this big difficulty Eversafe marine performed detailed calculations to find good solutions of airbag launching. By discussing with shipyard Eversafe Marine decided a dredging plan to ensure the launching.
On 22th November Eversafe launching team arrived at shipyard to prepare the launch. After two days working, we finished the air bag ship lifting and blocks removal works. In 5 PM of 24th the final launching started. After pulling ropes were cut off the ship started to move slowly. With rolling airbags it entered into water smoothly and steadily until floated totally. The whole launch took 90 seconds.
One client from South American shipyard was invited for this airbag launching view. The client was interested in changing slipway launching to air bag launching in near future.
In November Eversafe successfully launched 4 new built vessels which include two cargo ships and two OSV. In the winter of shipbuilding industry around the world Chinese shipbuilding market still hold a strong increasing posture that is food for thought.
Friday, October 14, 2011
LPG Cargo Tank Air bags lifting Project-Eversafe Marine
On May 29 2011 Eversafe Marine Engineering Company successfully completed a LPG Cargo Tank lifting Project with heavy lifting airbags in COSCO shipyard. That VLGC cargo tank weighs 1600 tons with 40 m length , 30 m width and 20 m height.
During the Japanese Tsunami in March 2011 that VLGC hold space was damaged and water ingress of approximately 7m above the inner bottom caused the cargo tank to float freely. As a consequence the 64 pieces wooden liners from the lower tank supports have floated out and the tank was sitting directly on the steel plates. The cargo tank had to be lifted in order to fit back the wooden liners.
Airbag lifting would take and distribute the load evenly over the inner bottom and tank bottom. Contrary to hydraulic jacks and floating crane no additional reinforcements of the structure was necessary.
Also airbag lifting can be precisely controlled which is also one of selection reasons. The tank in hold place has very limited space from the top and sides: the space on top of tank is limited to 12 cm and in four sides only 60 cm space is available. To put back wooden liners tank need to be lifted up11 cm from the support blocks and lowered down one centimeter by one centimeter. So the lifting and descent must be totally controlled.
A pre-inspection was carried out by Eversafe Marine in order to determine the space available for the airbags. One access hole was cut in the portside of the hold space to allow smooth transport of airbags.
To settle airbags in proper positions the limited space made troubles for us. Since no heavy instruments can be installed for the airbag hauling in the hold space people have to use chain blocks as main transportation tool. The height from hold space to tank bottom is 64 cm people even can not squat when they work under the tank. It is a hard work to settle total airbags in their positions in two days.
In the morning of May 29 2011 the airbag tank lifting work started. Eversafe technicians carefully controlled the inflation process to ensure upright lifting up. In our hour the tank was lifted 11 cm up from the support blocks. In the afternoon when all wooden liners were placed in proper positions the tank was lowered down one centimeter by one centimeter until liners fit into frames. Tank lifting/lowering was completed on 29 May, 17:00 local time. All 64 pieces of wooden liners were placed back successfully.
During the Japanese Tsunami in March 2011 that VLGC hold space was damaged and water ingress of approximately 7m above the inner bottom caused the cargo tank to float freely. As a consequence the 64 pieces wooden liners from the lower tank supports have floated out and the tank was sitting directly on the steel plates. The cargo tank had to be lifted in order to fit back the wooden liners.
Airbag lifting would take and distribute the load evenly over the inner bottom and tank bottom. Contrary to hydraulic jacks and floating crane no additional reinforcements of the structure was necessary.
Also airbag lifting can be precisely controlled which is also one of selection reasons. The tank in hold place has very limited space from the top and sides: the space on top of tank is limited to 12 cm and in four sides only 60 cm space is available. To put back wooden liners tank need to be lifted up11 cm from the support blocks and lowered down one centimeter by one centimeter. So the lifting and descent must be totally controlled.
A pre-inspection was carried out by Eversafe Marine in order to determine the space available for the airbags. One access hole was cut in the portside of the hold space to allow smooth transport of airbags.
To settle airbags in proper positions the limited space made troubles for us. Since no heavy instruments can be installed for the airbag hauling in the hold space people have to use chain blocks as main transportation tool. The height from hold space to tank bottom is 64 cm people even can not squat when they work under the tank. It is a hard work to settle total airbags in their positions in two days.
In the morning of May 29 2011 the airbag tank lifting work started. Eversafe technicians carefully controlled the inflation process to ensure upright lifting up. In our hour the tank was lifted 11 cm up from the support blocks. In the afternoon when all wooden liners were placed in proper positions the tank was lowered down one centimeter by one centimeter until liners fit into frames. Tank lifting/lowering was completed on 29 May, 17:00 local time. All 64 pieces of wooden liners were placed back successfully.
Labels:
airbag lifting,
heavy lifting,
liners,
LPG tank,
tank lifting